1
|
Cam Lo - La Son Highway
|
Quang Tri, Thua Thien Hue
|
Length: 102km; Highway type B, 4 lanes, 6 lanes at the end of the projects, average speed 100-120km/h.
|
1.095
|
PPP,BOT
|
Board of Investment for Private Public Projecsts, Ministry of Transport
Add: 80 Tran Hung Dao, Hà Nội. ĐT: 84-4-39410775.
|
2
|
National Road no.19 From cau Bà Gi Junction to Plei ku city
|
Binh Dinh, Gia Lai
|
Upgrade the ramp of 153km flat plain and mountain plain level III, average speed 60-80km/h
|
100
|
BOT
|
Board of Investment for Private Public Projecsts, Ministry of Transport
Add: 80 Tran Hung Dao, Hà Nội. ĐT: 84-4-39410775.
|
3
|
Dau Giay-Lien Khuong Highway
|
Lam Dong
|
Total length: 200km, highway type A, 4 lanes, maximum average speed 100km/h
|
3.520
|
PPP
|
Department of Planning and Investment Lâm Đồng,
Add: No 2 Trần Hưng Đạo, TP Đà Lạt, tỉnh Lâm Đồng. Tel:063 3822311, Fax:063 3834806
|
4
|
Connecting road between central city of Quảng Ngãi and Dung Quất II Port
|
Quảng Ngãi
|
Transport project Group A, Road level I flat plain. Required use land: 140ha
|
71
|
PPP
|
Quảng Ngãi Department of Planning and Investment
Add: 96 Nguyễn Nghiêm, TP Quảng Ngãi, tỉnh Quảng Ngãi. Tel:055 3822868 Fax:055 3825701
|
5
|
Upgrade Hanoi - HCMC railway route
|
Northern Central to Southern Central
|
Upgrade railroad infrastructure, bottle-neck ramp by building tunnel over mountain pass including Khe net, Hai Van; open new stations. Upgrade average speed to 90 km/h.
|
2.300
|
BOT, ODA
|
Board of Investment for Private Public Projecsts, Ministry of Transport
Add: 80 Tran Hung Dao, Hà Nội. Tel: 84-4-39410775.
|
6
|
Cam Ranh Int'l Airport
|
Khánh Hòa
|
Int'l airport 4F standard, capacity 1 million passenger/year
|
212
|
PPP,BOT
|
Board of Investment for Private Public Projecsts, Ministry of Transport
Add: 80 Tran Hung Dao, Hà Nội. Tel: 84-4-39410775.
|
7
|
Van Phong int'l port- phase 1
|
Vạn Thạnh, Vạn Ninh, Khánh Hòa
|
In 2020 receive sea vessel of 12 TEU, est. capacity of 17 million TEU, total area 405 ha, length from lauching terminal of 4450 to 5710m.
|
500
|
FDI or Joint Venture
|
Vân Phong EZ Board of Management Khánh Hòa
Add: 4-6 Lê Thành Phương, Nha Trang
Tel: 3560493
|
8
|
Lien Chieu port
|
Danang
|
Receiving ships of 50,000-80,000 DWT, in the second stage: newly build 2 berths 50,000 DWT, capacity 2.5-3.5 million tonnes per year
|
65
|
PPP
|
Đà Nẵng’s Department of Planning and
Investment, Đà Nẵng. Tel:0511 3822217 Fax:0511 3829184
|
9
|
Factory producing new energy and renewable energy equipment
|
Northern, central and southern regions
|
To manufacture components, spare-parts for power generator system from new and renewable energy.Capacity: 100,000 tonnes of products per year
|
40
|
JV, 100% FDI
|
Department of Planning under the Ministry of Industry and Trade. No54 Hai Ba Trung, Hanoi. Tel: 04 2220 2433. Fax: 04 2220 2525
|
10
|
Dung Quat coal-fired
thermal plant
|
Quảng Ngãi
|
Capacity 1,200MW, using coal imported from Australia and Indonesia, trade operation start from 2020 to serve power demand for Dung Quất Economic zone and neighboring area
|
140
|
PPP
|
Quang Ngai’s Department of Planning and Investment. No96 Nguyen Nghiem. Tel: 055 3822 868, Fax: 055 3825 701
|
11
|
Binh Dinh power centre
|
Bình Định
|
Newly build coal-fired power plants No2 and 3. land area: 250ha, estimated time of completion: 2018
|
4.000
|
PPP
|
Bình Định’s Department of Planning and Investment. 35 Lê Lợi, Quy Nhơn, Bình Định. Tel: 056 3822628 Fax:056 3824509
|
12
|
Huong Van solid waste treatment area
|
Thừa Thiên Huế
|
Total area 40ha
|
40
|
Joint Venture
|
Ministry of Construction’s Infrastructure Department. No37 Le Dai Hanh, Hanoi. Tel: 04 3974 0112. Fax: 04 3976 2157
|
13
|
Binh Nguyen solid waste treatment area
|
Quảng Ngãi
|
Total area 70ha
|
85
|
Joint Venture
|
Ministry of Construction’s Infrastructure Department. No37 Le Dai Hanh, Hanoi. Tel: 04 3974 0112. Fax: 04 3976 2158
|
14
|
Cat Nhon solid waste treatment area
|
Bình Định
|
Total area 70ha
|
75
|
Joint Venture
|
Ministry of Construction’s Infrastructure Department. No37 Le Dai Hanh, Hanoi. Tel: 04 3974 0112. Fax: 04 3976 2159
|
15
|
A waste water treatment facility in Chan May-Lang Co economic zone
|
Thừa Thiên Huế
|
Capacity of 35,000 cubic metres/day, construction until 2020
|
39
|
PPP
|
Thua Thien-Hue’s Department of Planning and Investment. Add: Ton Duc Thang street, Hue city. Tel: 054 382 1264. Fax: 054 382 1264
|
16
|
Software park
|
Danang
|
Total area 10 hectares
|
228
|
PPP
|
Danang Planning and Investment Department, No 2 Quang Trung Str. Tel:0511 3822217 Fax:0511 3829184
|
17
|
Vocational technical College
|
Khu KTM Chu Lai
|
Provide high quality human resources for domestic firms and FDI enterprises in Vietnam
|
40
|
Joint venture of 100% FDI
|
Department of Investment of Quang Nam: 02A Tran Phu, Tam Ky city. Tel: (84) 510-3810866. Fax : (84) 510.3810396;
|
18
|
Chan May Vocational School for workers
|
Chan May Lang Co Economic Zone, Thua Thien Hue Province
|
Provice human resources for Chan May Economic Zone. 500 person/year
|
20
|
Various models
|
Department of Invesment of Thua Thien Hue province. Ton Duc Thang road, Hue city. Tel:054-3821264 FAX:054-3821264
|
19
|
Binh Dinh Obstertrics-pediatric hospital
|
Binh Dinh
|
Hospital size: 500 beds, total area: 3,72 hectares
|
24
|
PPP
|
Binh Dinh Planning and Investment Department, 35 Le Loi, Quy Nhon City, Binh Dinh Province. Tel: 056 3822628 Fax:056 3824510
|